4 4 3:NEWDAY Event/de: Difference between revisions

From SEPsesam
(Created page with "{{Copyright SEP AG|de}}")
 
(Created page with "==Übersicht==")
Line 5: Line 5:


{{Navigation_latest|release=4.4.3|link=[[SEP_sesam_Documentation#Previous_versions|Documentation archive]]}}<br />
{{Navigation_latest|release=4.4.3|link=[[SEP_sesam_Documentation#Previous_versions|Documentation archive]]}}<br />
==Overview==
==Übersicht==
<div class="boilerplate metadata" id="Additional resources" style="background-color:#ecedf1; color:#8695a7; border: 1px ridge #cdd3db; margin: 0.5em; padding: 0.5em; float: right; width: 25%; "><center><b>Additional resources</b></center>
<div class="boilerplate metadata" id="Additional resources" style="background-color:#ecedf1; color:#8695a7; border: 1px ridge #cdd3db; margin: 0.5em; padding: 0.5em; float: right; width: 25%; "><center><b>Additional resources</b></center>
{|style="margin: auto; margin-bottom:1em; width:100%; border:0px solid grey;"
{|style="margin: auto; margin-bottom:1em; width:100%; border:0px solid grey;"

Revision as of 13:00, 22 June 2017

Other languages:

Copyright © SEP AG 1999-2024. Alle Rechte vorbehalten.

Jede Form der Reproduktion der Inhalte dieses Benutzerhandbuches, ganz oder in Teilen, ist nur mit der ausdrücklichen schriftlichen Erlaubnis der SEP AG gestattet. Bei der Erstellung dieses Benutzerhandbuches wurde mit größtmöglicher Sorgfalt gearbeitet, um korrekte und fehlerfreie Informationen bereit stellen zu können. Trotzdem kann die SEP AG keine Gewähr für die Richtigkeit der Inhalte dieses Benutzerhandbuches übernehmen.

Docs latest icon.png Willkommen in der aktuellsten Version der SEP sesam Dokumentation 4.4.3. Frühere Versionen der Dokumentation finden Sie hier: Documentation archive.


Übersicht

SEP sesam NEWDAY is a predefined SEP sesam daily event that resets the backup event calendar and is managed by the SEPuler. It is accessible under schedules: Main Selection -> Scheduling -> Schedules. A NEWDAY event is used by SEP sesam to reorder its database and enable uninterrupted activity of SEP sesam processes, therefore it must never be completely deactivated or it will cause SEP sesam to stop working properly. See NEWDAY-event roles.

How does it work – defining a backup day

NEWDAY is used to cancel all pending jobs from the previous day and to define a new backup day. All SEP sesam protocol and log files are created with the date of the backup day.

If a NEWDAY event is set for 08:00, the backup day is defined from 8 a.m. of the current day to 8 a.m. of the next day. Backups that run after midnight – the actual date change – are 'time stamped' with the previous day's date in order to avoid the creation of two backups for the same data (one save set for day 1 and another for day 2).

With SEP sesam NEWDAY, all media backed up from one day have the same date. SEP sesam NEWDAY gives system administrators flexibility to extend backup routines to run after midnight and retain the backup date of the prior day. This is very useful when the computers requiring backups exceed the time allotment between the end of day and midnight.

Weekends are often used for full backups. When this is the case, it is advisable to skip the NEWDAY event on weekends. Define the execution as a weekly event but without execution on weekend to enable scheduled full backups to be performed. Backups can be arranged in shifts.

SEPuler newday event.png


Other NEWDAY-event roles

Besides resetting the event calendar and setting a new backup day, NEWDAY also performs the following:

  • Aborts all running backups (data created after NEWDAY belong to the next backup sequence). This is especially useful in complex network environments when alerts are not transmitted to the backup server. These backup tasks, which would otherwise remain suspended, are terminated by the NEWDAY event.
  • Deletes files and database entries for save sets which no longer exist.
  • Finalizes the SEP sesam status and daily log files.
  • Reorganizes the SEP sesam database.
  • Advances the event calendar (SEPuler) by one day.
  • Restarts the SMS- and STPD-processes.
Information sign.png Anmerkung

To ensure error-free execution of the SEP sesam backup environment, SEP NEWDAY should never be completely deactivated. Switching NEWDAY off prevents SEP sesam from reordering its database. SEP sesam will no longer be able to delete old log files and will cause the system to exceed system disk drive storage.

Example

Backup day is defined from April 10th 2017 from 08:00 until April 11th at 08:00. This means that a backup starting on April 11th 2017 at 00:40 will be assigned to backup day April 10th 2017 and will appear in the daily protocol as 20170410.