4 4 3 Beefalo:Schritt 6: Zeitpläne
Schritt 6: Zeitpläne
Anmerkung | |
In order to improve usability, SEP sesam GUI has been redesigned to be more user-friendly without significantly changing the interface logic. SEP sesam documentation update (such as screenshots) to reflect these changes is being done in a phased manner, therefore the screenshots may still show the GUI from previous versions. |
In the Main Selection -> Scheduling -> Schedules you can view all configured schedules and events that are connected to them. Use the buttons in the toolbar to configure scheduling of all processes in SEP sesam.
You can create a new schedule or use the existing one. In the schedule, a new event is created and its job is defined. The job is then processed at the set time and, if necessary, forwarded to the next execution time in the calendar.
Depending on your SEP sesam version (4.4.2 or 4.4.3), schedule options may be slightly different. For more information, see Creating a Schedule.
The 4.4.3 version provides a few additional options, such as user-defined dates (custom calendar), described in Creating a Custom Calendar.